What’s going on at Cooperman?

June 25th, 2014 by Sarah Laleman Ward

Excellent question. In preparation for the renovation of the 6th and 7th floors of the Cooperman Library, books and journals are being relocated, shelving is being moved and installed in various places, and things are changing every day.

We understand and appreciate that this is inconvenient for students wishing to use the library for research and study during the summer session. We are doing our best to minimize the distractions and inconveniences posed by the shifting of materials and building of shelves. For more information about the future of the 6th and 7th floors of the East Building, please refer to the Facilities Management & Planning page.

As to the day-to-day happenings in the Cooperman Library, we will do our level best to keep you posted as to where materials are each day. We’ll update our white board at the 3rd Floor entrance at 3:30 each day. We will also post information as it becomes available in our online Renovation Update guide.

IMAG2580

 

As always, we want to hear from you. Please contact us with any questions or concerns either via our Suggestion Box on the 3rd Floor of Cooperman, or online: http://library.hunter.cuny.edu/contact

Share:
  • Facebook
  • Twitter
  • email
  • RSS
  • del.icio.us
  • LinkedIn

Tags: , ,
Posted in Library News

Leave a Reply

CAPTCHA Image